{"id":1660,"date":"2019-07-01T15:44:56","date_gmt":"2019-07-01T18:44:56","guid":{"rendered":"https:\/\/fastindustria.com.br\/?p=1660"},"modified":"2023-06-28T09:24:14","modified_gmt":"2023-06-28T12:24:14","slug":"construcao-de-estacao-de-tratamento-de-esgoto-em-lauro-muller","status":"publish","type":"post","link":"https:\/\/fastindustria.com.br\/en\/construcao-de-estacao-de-tratamento-de-esgoto-em-lauro-muller\/","title":{"rendered":"Construction of a Sewage Treatment Plant in Lauro M\u00fcller"},"content":{"rendered":"<p><span class=\"s1\">With accelerated works, the Sewage Treatment Plant (ETE) which is<\/span><span class=\"s2\">\u00a0<\/span><span class=\"s1\">being built in Lauro M\u00fcller (SC) will be<\/span><span class=\"s2\">\u00a0<\/span><span class=\"s1\">responsible for the collection and treatment of 72% of the city&#039;s sewage, covering the neighborhoods of Centro, Sumar\u00e9, I\u00e7arense, Santa B\u00e1rbara, KM1, Arizona and Bela Vista.<\/p>\n<p><\/span><span class=\"s1\">According to engineer Wanderley Gomes, from the company MPB Saneamento, hired by the Santa Catarina Water and Sanitation Company (CASAN) to manage the work, he says that \u201cthe Sewage Treatment Plant is<\/span><span class=\"s2\">\u00a0<\/span><span class=\"s1\">in the foundation part, with completion expected within five to six months. Already<\/span><span class=\"s2\">\u00a0<\/span><span class=\"s1\">we did the earthmoving, excavation and now we are making a subgrade, which is<\/span><span class=\"s2\">\u00a0<\/span><span class=\"s1\">a cement soil that will be<\/span><span class=\"s2\">\u00a0<\/span><span class=\"s1\">the base of the station\u201d.<\/p>\n<p><\/span><span class=\"s1\">The structural services are being carried out by Construtora Fernandes, and the installation work by Fast. As it does not use lagoons, there is no<\/span><span class=\"s2\">\u00a0<\/span><span class=\"s1\">the risk of soil contamination and the dependence on weather conditions. In addition, there is<\/span><span class=\"s2\">\u00a0<\/span><span class=\"s1\">efficient control of possible odors.<\/p>\n<p><\/span><span class=\"s1\">The construction and urbanization area will be<\/span><span class=\"s2\">\u00a0<\/span><span class=\"s1\">of 2,500 square meters. The resource for the sanitation system installation work is<\/span><span class=\"s2\">\u00a0<\/span><span class=\"s1\">from Caixa (85%) and CASAN (15%).<\/p>\n<p><\/span><span class=\"s1\">According to engineer Gomes, the works on the sewage network are already underway.<\/span><span class=\"s2\">\u00a0<\/span><span class=\"s1\">99% are completed. The team is<\/span><span class=\"s2\">\u00a0<\/span><span class=\"s1\">carrying out the last stage, which includes the \u201cinterconnection of the different steps that were carried out, review, regularizations, corrections of errors that occurred during execution\u201d.<\/span><\/p>\n<p class=\"p4\">\n<p class=\"p3\"><span class=\"s1\">Source:\u00a0<a href=\"https:\/\/www.casan.com.br\/noticia\/index\/url\/estacao-de-tratamento-de-esgoto-com-as-obras-a-todo-vapor-em-lauro-muller#0\" target=\"_blank\" rel=\"noopener\">Casan<\/a>\u00a0<\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>With accelerated construction, the Sewage Treatment Plant (ETE) being built in Lauro M\u00fcller (SC) will be responsible for collecting and treating 72% of the city&#039;s sewage, covering the neighborhoods of Centro, Sumar\u00e9, I\u00e7arense, Santa B\u00e1rbara, KM1, Arizona and Bela Vista. According to engineer Wanderley Gomes, from the company MPB Saneamento, hired by Companhia [\u2026]<\/p>","protected":false},"author":1,"featured_media":1661,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"arquivo_cliente":"","_joinchat":[],"footnotes":""},"categories":[42],"tags":[],"class_list":["post-1660","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"acf":[],"_links":{"self":[{"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/posts\/1660","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/comments?post=1660"}],"version-history":[{"count":1,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/posts\/1660\/revisions"}],"predecessor-version":[{"id":1662,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/posts\/1660\/revisions\/1662"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/media\/1661"}],"wp:attachment":[{"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/media?parent=1660"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/categories?post=1660"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/tags?post=1660"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}