{"id":1508,"date":"2020-07-29T14:07:06","date_gmt":"2020-07-29T17:07:06","guid":{"rendered":"https:\/\/fastindustria.com.br\/?p=1508"},"modified":"2023-06-28T09:48:37","modified_gmt":"2023-06-28T12:48:37","slug":"construcao-da-estacao-de-tratamento-de-esgoto-santa-terezinha-em-canela-rs","status":"publish","type":"post","link":"https:\/\/fastindustria.com.br\/en\/construcao-da-estacao-de-tratamento-de-esgoto-santa-terezinha-em-canela-rs\/","title":{"rendered":"Construction of the Santa Terezinha Sewage Treatment Plant, in Canela\/RS"},"content":{"rendered":"<p>Construction work on the Santa Terezinha Sewage Treatment Plant (ETE), which is being built in Canela\/RS, began in 2019 and is progressing at a fast pace, with delivery scheduled for August 2021.<\/p>\n<p>&nbsp;<\/p>\n<p>On July 23, the works were inspected at the site. On the occasion, Barbara Boesing dos Santos, an engineer from our company, and Caroline Ramos, an engineer from the Riograndense Sanitation Company (Corsan), explained that the plant will increase the city&#039;s sewage treatment capacity by four times.<\/p>\n<p>&nbsp;<\/p>\n<p>The project, which is being financed by Corsan and executed by Fast, will become \u201cone of the most modern sewage stations in the country\u201d, according to Corsan\u2019s expansion director, Julio Hofer.<\/p>\n<p>&nbsp;<\/p>\n<p>At a value of R$24,497,450.00, the investment includes the supply, construction, installation and assisted operation of a compact prefabricated ETE. The station will have the capacity to treat 90 liters per second (l\/s), through two modules of 45 l\/s each. It will operate with the tertiary treatment system and have a BOD (Biological Oxygen Demand) removal efficiency, that is, the amount of oxygen consumed in the degradation of organic matter greater than 90%.<\/p>\n<p>&nbsp;<\/p>\n<p>Source: Folha Portal<\/p>","protected":false},"excerpt":{"rendered":"<p>As obras da Esta\u00e7\u00e3o de Tratamento de Esgoto (ETE) Santa Terezinha, que est\u00e1 sendo constru\u00edda em Canela\/RS, iniciaram em 2019 e seguem em ritmo acelerado, com previs\u00e3o de entrega para agosto de 2021. &nbsp; No \u00faltimo dia 23 de julho, foi realizada a vistoria das obras no local. Na ocasi\u00e3o, Barbara Boesing dos Santos, engenheira [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1509,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"arquivo_cliente":"","_joinchat":[],"footnotes":""},"categories":[42],"tags":[],"class_list":["post-1508","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"acf":[],"_links":{"self":[{"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/posts\/1508","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/comments?post=1508"}],"version-history":[{"count":1,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/posts\/1508\/revisions"}],"predecessor-version":[{"id":1510,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/posts\/1508\/revisions\/1510"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/media\/1509"}],"wp:attachment":[{"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/media?parent=1508"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/categories?post=1508"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/tags?post=1508"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}