{"id":1474,"date":"2020-10-20T13:47:37","date_gmt":"2020-10-20T16:47:37","guid":{"rendered":"https:\/\/fastindustria.com.br\/?p=1474"},"modified":"2023-06-28T09:52:23","modified_gmt":"2023-06-28T12:52:23","slug":"fast-realiza-workshop-lean","status":"publish","type":"post","link":"https:\/\/fastindustria.com.br\/en\/fast-realiza-workshop-lean\/","title":{"rendered":"Fast holds Lean Workshop"},"content":{"rendered":"<p>Have you heard of the Lean methodology?<\/p>\n<p>&nbsp;<\/p>\n<p>The most respected companies in the world adopt this management philosophy and good practices based on waste reduction and continuous improvement.<\/p>\n<p>&nbsp;<\/p>\n<p>Here at Fast it\u2019s no different. In September we held a Lean Workshop with employees from the supply and PPC sectors.<\/p>\n<p>&nbsp;<\/p>\n<p>Check out what contributor Alexia Cola\u00e7o thought:<\/p>\n<p>&nbsp;<\/p>\n<p>\u201cAt the Lean Workshop, I realized that we shouldn\u2019t be afraid of problems. We need to expose them and analyze them as opportunities for improvement. The workshop showed us several tools that can be applied in these situations, such as 5W2H, brainstorming, and the Fishbone Diagram. With this mindset, I can improve the sector\u2019s activities and avoid recurring mistakes.\u201d<\/p>\n<p>&nbsp;<\/p>\n<p>Contributor Thiago Scapini also shared his impressions:<\/p>\n<p>&nbsp;<\/p>\n<p>\u201cThe Lean Workshop helped us to look at our day-to-day production process methods with \u2018different eyes\u2019. With tools such as 5S and continuous flow, the execution of activities becomes more assertive and standardized. Thus, reducing waste and always seeking continuous improvement by each sector.\u201d<\/p>\n<p>&nbsp;<\/p>\n<p>Congratulations to this team, which is always improving and contributing to increasingly high-quality deliveries here at Fast.<\/p>","protected":false},"excerpt":{"rendered":"<p>Have you heard of the Lean methodology? The most respected companies in the world adopt this management philosophy and best practices based on waste reduction and continuous improvement. Here at Fast, it\u2019s no different. In September, we held a Lean Workshop with employees from the supply and PPC sectors. Check out what [\u2026]<\/p>","protected":false},"author":1,"featured_media":1475,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"arquivo_cliente":"","_joinchat":[],"footnotes":""},"categories":[42],"tags":[],"class_list":["post-1474","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"acf":[],"_links":{"self":[{"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/posts\/1474","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/comments?post=1474"}],"version-history":[{"count":1,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/posts\/1474\/revisions"}],"predecessor-version":[{"id":1476,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/posts\/1474\/revisions\/1476"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/media\/1475"}],"wp:attachment":[{"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/media?parent=1474"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/categories?post=1474"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/fastindustria.com.br\/en\/wp-json\/wp\/v2\/tags?post=1474"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}